Ask anyone who’s opened a new office what held things up, and furniture often comes near the top of the list. The made-to-order pieces take the longest, yet they’re usually ordered last, after the lease, the renovation and the IT are sorted. By then, the move-in date doesn’t leave much room.
Most new office furniture checklists cover everything from Wi-Fi to stationery and give furniture a single line. This one covers furniture only. You’ll get a checklist for each area of the office, a timeline for what to order when, and a list of things to check on installation day.
If you’re also handling IT, security or supplies, keep a separate list for those. They run on a different schedule.
Key Takeaways
- Settle the layout before you order anything. Headcount and floor plan decide how many workstations fit and where they go.
- Order made-to-order pieces first. Workstations, partitions and custom storage take longest; stock chairs and pedestals can come later.
- Fix the furniture layout before power and data points go in. Moving a socket after the fit-out costs time and money.
- Check every item on installation day. Compare what arrives against the order before the installers leave.
Before You Order: Headcount, Floor Plan and Budget
Three things decide your furniture order: how many people you’re seating, how much floor space you have, and what you can spend. Get these down on paper first.
- Count heads for the next one to two years. Plan for the team you’ll have after your next round of hiring, not just today’s. It’s cheaper to leave a spare workstation than to squeeze one in later.
- Get an accurate floor plan. Mark columns, windows, doors, fire exits, and where the power and data points are or will be.
- Check how much space each person needs. Knight Frank’s guide to office space requirements in Singapore puts it at about 80–100 sq ft per person for consultancy and professional services, 100–150 sq ft for banking and finance, and 130–200 sq ft for tech and media firms. It also suggests adding 15–20% for corridors and circulation space.
- Sanity-check against current figures. A 2026 guide from Upflex on finding office space in Singapore says conventional offices here typically allow 100–150 sq ft per person, which lines up with the older benchmark.
- Split your budget by area. Workstations and chairs often take the biggest share because you’re buying them by headcount. Leave room for storage and meeting rooms, which are easy to underestimate.
Once the numbers are clear, sketch where each zone goes. For ideas on arranging each area, see our guide on how to organise office furniture.
The New Office Furniture Checklist, Area by Area
Most offices need furniture for six areas. Work through each one against your floor plan and tick off what applies. For help weighing up materials, sizes and features, see how to choose office furniture.
Workstations and partitions
- Workstations for every seat, plus one or two spares for growth
- Partition height and type (fabric, glass or low divider)
- Cable trays and cable management along each run
- Desk size per person, matched to how much screen and paper work they do
Office chairs
- A task chair for every workstation, adjustable for height and back support
- Visitor chairs for managers’ offices and reception
- Meeting room chairs, counted per table
Browse the range of office chairs to compare models.
Storage
- A pedestal under each desk for personal files. Mobile pedestals roll out of the way when needed.
- Lockable cupboards for shared files and stationery. Steel office cupboards handle daily use well.
- A compactus for large archives, since compactus filing systems fit more files into less floor space.
- Staff lockers if people hot-desk or need somewhere for bags. See the range of office lockers.
Meeting and conference rooms
- One table per room, sized to the number of seats
- A whiteboard or noticeboard
- A credenza or low cabinet for supplies
Reception
- A reception counter or desk that fits the entrance
- Visitor seating for guests waiting to be met
- A small coffee table or display shelf
Pantry and staff room
- Tables and chairs for breaks and lunch
- Storage for crockery and pantry supplies
If a space has awkward corners, pillars or odd dimensions, custom-built furniture can be made to fit.
When to Order: A Timeline From Lease Signing to Move-In
The order of things matters more than the exact dates. Order made-to-order and custom items first, stock items last, and lock the layout in before the electrician finishes. Here’s how it fits together.
| Stage | What to do for furniture | Who’s involved |
|---|---|---|
| Lease signed | Confirm headcount, get the floor plan, set the budget | You, landlord |
| Layout agreed | Fix workstation positions so power and data points can be planned around them | You, fit-out contractor, furniture supplier |
| Order placed | Order workstations, partitions and custom pieces first. Ask for lead times on every item | You, furniture supplier |
| Fit-out works | Order stock items like chairs and pedestals; book delivery dates | You, furniture supplier |
| Works finished | Delivery and installation once flooring, painting and cleaning are done | Furniture supplier, building management |
| Move-in | Final check, adjust chairs and desks for each person | You, staff |
How early should you start? Office World Supplies’ checklist for setting up a new office in Singapore suggests ordering desks, chairs and storage 8 to 12 weeks before the move, and receiving and assembling furniture 2 to 4 weeks before. Lead times vary a lot between stock and made-to-order items, so ask your supplier for lead times on each item when you get the quote, and add a buffer for delays.
Two things push timelines back more than anything else:
- Late layout changes. Each change ripples into partitions, cabling and power points.
- Waiting for the renovation to finish before ordering. Made-to-order furniture can be made while the fit-out is underway.
Delivery and Installation Day Checklist
- Get building management approval for the delivery date and time
- Book the service lift and loading bay, and check any time restrictions
- Arrange access passes for the delivery and installation team
- Protect floors and walls along the delivery route
- Check every item against the delivery order: quantity, model, colour and any damage
- Make sure workstations are level and cable trays are connected
- Collect keys for every lockable cupboard, pedestal and locker, and label them
- Ask the team to take away packaging before they leave
Raise any missing or damaged items before the installers go. It’s much easier to sort out on the day than a week later.
Moving Office or Fitting Out? What Changes for Furniture
The checklist above works for any new office. A move or a fit-out adds a few extra steps.
If you’re moving office
- Audit what you already have. List every desk, chair and cabinet, and note its condition.
- Check what fits the new layout. Furniture that suited the old floor plan may not suit the new one.
- Decide what to keep, sell or dispose of. Do this early, so you know exactly what to order new.
- Plan for storage if dates slip. Boxpark’s checklist for moving offices in Singapore suggests putting furniture into self-storage if the new office isn’t ready on time.
If you’re fitting out a new space
- Share the furniture layout with your contractor before electrical work starts, so sockets and data points line up with desks.
- Schedule delivery after the dusty works. Flooring, painting and ceiling work should be finished, and the space cleaned.
- Agree who coordinates what. Decide whether you, the contractor or the supplier is booking lifts and loading bays.
Getting this right matters because fit-outs aren’t cheap. Cushman & Wakefield’s Singapore office fit-out cost guide puts the average for a collaborative hybrid fit-out at about SGD 180 per sq ft. Moving a power point because a desk ended up in the wrong place adds to that.
Plan Your New Office with Asia Furniture
A new office comes together faster when the furniture is planned early. Keep three things in mind:
- Settle the layout first. Headcount and floor plan decide everything else.
- Order made-to-order items earliest. Stock items can follow while the fit-out is underway.
- Check everything on installation day. Sort out problems before the installers leave.
Asia Furniture has designed and manufactured office furniture and storage systems in Singapore since 1967. Browse our office furniture in Singapore, then send us your floor plan and headcount for a quote.
Frequently Asked Questions
What furniture do you need for a new office?
Most offices need furniture for six areas: workstations, chairs, storage such as pedestals and cupboards, meeting rooms, reception, and a pantry or staff room. Start with a workstation, chair and pedestal for each person, then add shared storage and meeting tables based on your floor plan.
How long does it take to furnish a new office?
It depends on what you order. Stock items such as chairs and pedestals can arrive quickly, while made-to-order workstations, partitions and custom-built pieces take longer. Ask your supplier for lead times on each item when you get a quote, and start ordering as soon as your layout is agreed.
How much office space does each employee need in Singapore?
A common guide is about 100 to 150 sq ft per person, though it varies by industry. Professional services firms often work with less, while tech and media firms tend to need more. Add around 15 to 20 percent on top for corridors and circulation.
Should you furnish an office all at once or in phases?
Most offices furnish the essentials before opening day, meaning workstations, chairs, storage and at least one meeting room. Pantry, lounge and extra meeting room pieces can follow in a second phase if budget or time is tight.
Can you reuse furniture from your old office?
Yes, if it’s in good condition and suits the new layout. Check each piece before the move, and make sure reused items match what you’re buying new, especially desks and storage that will sit side by side.